East 59th is a New York styled rooftop bar and grill based in Leeds. During the day they serve contemporary American cuisine before transforming into a trendy Manhattan rooftop bar at night serving cocktails and drinks.

Before the bar and grill opened, Hensall were tasked with an extensive fit out project which included a wide range of our electrical services.

PROJECT STATS


SERVICES UNDERTAKEN

Air conditioning, Restaurant ventilation, Kitchen ventilation supply, Kitchen ventilation extract, Public health systems to all sanitary areas, Refrigeration, Building Management Systems.

Electrical
Project Management, Design including working drawings, Site Setup, Main and Sub Distribution System, Containment, Lighting and Emergency Lighting, Lighting Control System, Small Power, External Lighting System and Controls, Data Wiring, Fire Alarm, Security, Disabled Alarm, AV Systems wiring, Disabled Refuge, Testing and Commissioning of all Systems.

CLIENT

CUSTOMER: EAST 59TH

SECTOR: HOSPITALITY

LOCATION: LEEDS

PROJECT LENGTH

7 Months

PROJECT VALUE

£384,000

COMPLETION DATE

October 2017

PROJECT OVERVIEW

We were responsible for the overall project management of the electrical aspects of the fit out at East 59th, which included working drawings and full electrical design. The project had to be completed within a tight timeframe due to the requirement for staff training four weeks before the opening date.

The mechanical aspect of the project saw us install a new comfort cooling and heating system, as well as a full ventilation package that included various air movement, plan grilles, diffusers and louvres. All pipework and associated sanitary-ware were installed throughout the restaurant, front and back of house. Finally, we installed a Building Management System to intelligently control the buildings ventilation, heating, cooling and domestic systems for maximum efficiency and comfort. This is all controlled via a 10” touchscreen mounted on the BMS panel itself.

Due to the restaurant’s 4th floor location in the Victoria Gate Shopping Centre access was extremely limited for large equipment, which meant much of the fit out needed to be completed on site. We overcame this challenge through intelligent planning to reach completion within the agreed 14 week fit out period.

We worked alongside the lighting provider to design and install a complex lighting and dimming system that would enable the building owner to choose from a wide variety of scene setting options. For the project we utilised LED, Halogen and bespoke luminaires, which would provide the desired lighting results whilst remaining as energy efficient as possible.

TESTIMONIAL

“From start to finish the project was planned and executed to the highest standards.”

FACILITIES DIRECTOR – D&D